Century OEM Replacement Motor, 1075 RPM, 1/2 HP, 200-230/460 V, 48 Frame, Semi Enclosed
- OEM Direct Replacement Motor
- 5.6" Diameter - 48 Frame
- Permanent Split Capacitor (PSC); Capacitor Required: 7.5 Mfd-440 Volts (Not Supplied with Motor)
- Open Shaft End and Opposite Shaft End End-Frame, Semi-Enclosed Shell, Air over
- Ball Bearing
- 1/2" Diameter Shaft with Flat
- Conduit Box
- Lug Mount, Vertical Shaft Up
- HM102-0024 replaces the following brands and item numbers: Carrier #HC43VL200, 230, 460 and 650, and HC44VL460, 465, 610, 852
$603.75 USD
SPECIFICATIONS
| Nameplate Specifications | |
| UPC | 786674027252 |
| Output HP | 1/2 Hp |
| Frequency | 60 Hz |
| Current | 4.6/2.3 A |
| Service Factor | 1 |
| Duty | Air Over |
| Frame | 48Y |
| Thermal Protection | Automatic |
| UL | Recognized |
| Voltage | 200-230/460 V |
| Speed | 1075 rpm |
| Phase | 1 |
| Insulation Class | B |
| Enclosure | Semi Enclosed |
| Ambient Temperature | 60 °C |
| CSA | Y |
| Technical Specifications | |
| Electrical Type | Permanent Split Capacitor |
| Poles | 6 |
| Mounting | Lug |
| Opp Drive End Bearing | Ball |
| Shaft Type | Flat |
| Frame Length | 5.75 in |
| Shaft Extension | 1.6 in |
| Rotation | Reversible |
| Frame Material | Rolled Steel |
| Overall Length | 9.74 in |
| Shaft Diameter | 0.500 in |
MANUALS
Related products
BRAND: Supplyshop
R404A (R-125/R-143a/R-134a) (44/52/4 wt%)
BRAND: Century
Available in 2-4 days
BRAND: Century
Available in 2-4 days
BRAND: Century
Available in 2-4 days
BRAND: Fasco
Replaces: Trane and Fasco models: X70671653-01,X70671656-01, X70671654, X70671652-01, MOT9192, MOT9188, 7126-4088, 7126-4089, 7126-4090, 7126-4299
Available in 2-4 days
BRAND: Genteq
Replaces: GE #5KC29BG5866S
Available in 2-4 days
BRAND: Fasco
Replaces: Carrier #E020-705563-02 and 7817-0299
Available in 2-4 days
BRAND: Fasco
Replaces: IEC #5KCP29BK6777S, 5KCP29BK790S, 5KCP29BK8383S, 700215-16
On Back Order Until Beginning of Sept. 2024
BRAND: MARS
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Marathon
Available in 2-4 days
BRAND: Fasco
Replaces: 17-09-6779, VQT-90, JA2M087R
Available in 2-4 days
BRAND: Fasco
Replaces: Miller # 301544
Available in 2-4 days
BRAND: Fasco
Used for Modine and Reznor unit heaters
Available in 2-4 days
BRAND: Fasco
Replaces: Lennox #P8-8326 and GE #5KCP49SG1008S
Available in 2-4 days

HVAC
Plumbing
Tools & Test Instruments