Fasco OEM Replacement Motor, 1450 RPM, 1/6 HP, 115-127 V, 42 Frame, Open Air Over
- OEM Direct Replacement Motor
- Permanent Split Capacitor (PSC); Capacitor Required: 5 Mfd-370 Volts (Supplied with Motor)
- Sleeve Bearing
- 1/2" Diameter Shaft with Flat
- 71" Leads
- Resilient Base
- HM102-0052 replaces the following brands and item numbers: 5KCP29DK8384S, S89208
$323.00 USD
SPECIFICATIONS
| Nameplate Specifications | |
| UPC | 815585027829 |
| Output HP | 1/6 Hp |
| Frequency | 60 Hz |
| Current | 2.3 A |
| Service Factor | 1 |
| Duty | Continuous |
| Frame | 42 (5" Diameter) |
| Thermal Protection | Automatic |
| UL | Recognized |
| Voltage | 115-127 V |
| Speed | 1450 rpm |
| Phase | 1 |
| Insulation Class | B |
| Enclosure | Open Air Over |
| Ambient Temperature | 40 °C |
| CSA | Y |
| Technical Specifications | |
| Electrical Type | Permanent Split Capacitor |
| Poles | 4 |
| Mounting | Resilient Base |
| Opp Drive End Bearing | Sleeve |
| Shaft Type | Flat |
| Shaft Extension | 8.75 in |
| Rotation | Counterclockwise Shaft End |
| Frame Material | Na |
| Overall Length | 21.02 in |
| Shaft Diameter | 0.500 in |
MANUALS
Related products
BRAND: Supplyshop
R404A (R-125/R-143a/R-134a) (44/52/4 wt%)
BRAND: Fasco
Replaces: Trane and Fasco models: X70671653-01,X70671656-01, X70671654, X70671652-01, MOT9192, MOT9188, 7126-4088, 7126-4089, 7126-4090, 7126-4299
Available in 2-4 days
BRAND: Fasco
Available in 2-4 days
BRAND: Fasco
Available in 2-4 days
BRAND: Genteq
Replaces: GE #5KC29BG5866S
Available in 2-4 days
BRAND: Fasco
Replaces: Carrier #E020-705563-02 and 7817-0299
Available in 2-4 days
BRAND: Fasco
Replaces: IEC #5KCP29BK6777S, 5KCP29BK790S, 5KCP29BK8383S, 700215-16
On Back Order Until Beginning of Sept. 2024
BRAND: MARS
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Broan-Nutone
Available in 2-4 days
BRAND: Marathon
Available in 2-4 days
BRAND: Fasco
Replaces: 17-09-6779, VQT-90, JA2M087R
Available in 2-4 days
BRAND: Fasco
Replaces: Miller # 301544
Available in 2-4 days
BRAND: Fasco
Used for Modine and Reznor unit heaters
Available in 2-4 days
BRAND: Fasco
Replaces: Lennox #P8-8326 and GE #5KCP49SG1008S
Available in 2-4 days
BRAND: Fasco
Replaces: Bryant #HC35VE-230, Emerson #K1543 and KA55CGD-9658, Franklin #8735560170B1 and Payne #5651AJX034000AEAA
Available in 2-4 days

HVAC
Plumbing
Tools & Test Instruments